Wind Turbine Maintenance Amidst March’s Low Winds and Ice Challenges
Fact sheet March 2024 | |
---|---|
Average wind speed (m/s) | ca. 6.4 m/s |
Production (GWh) | ca. 28 GWh |
Safety and environmental incidents | 0 |
Production in March was affected by lower average winds. There was also the effect of ice.
During the low wind days, the team did some tasks of the planned maintenance. Maintenance will continue from April onwards. The goal is to perform the maintenance when there is light wind.
With the end of winter there is a mix of melt and ice conditions. It is important that if you are moving around the area, pay attention when you are near the wind farm.