The focus in September has been the planned maintenance

Fact sheet September 2022
Average wind speed (m/s)ca. 7.8 m/s
Production (GWh)ca. 23 GWh
Safety and environmental incidents0

Some content

In September, the production was mainly affected by planned outage (overlaying grid), and the broken blade at BJV13.

 

BJV13

  • The safety perimeter of 250m applies, and a temporary fence has been installed.
  • The clean up is prepared. The start date is not known yet.
  • The root cause analysis has started, and the conclusion still pending
  • The blade exchange works have started

 

The focus in September has been the planned maintenance, and preparation for the winter season

When there is planned maintenance, road blocks are installed.

Roads have been inspected, and will be made ready for the winter (snow poles mainly)